From Tech Pack to Bulk: The Sample Development Timeline

A step-by-step look at the 10-working-day sampling process, the 5-8 week bulk window, inspection, packing and shipping options.

Stages of apparel production: steaming and finishing, fitting a jacket on a dress form, cutting a pattern, yarn cones, thread spools, an industrial sewing machine, the sewing floor and finished garments on a rail
Once the designs are finished, the schedule is what most brands underestimate. Knowing the sequence makes it much easier to set a launch date you can actually hit.

What You Need to Start

Two things unlock the process: your print or embroidery file in PDF or AI format, and a measurement chart for each design. With those, the details can be reviewed with you before anything is cut.

The Sample Stage: About 10 Working Days

Sampling is a chain of small steps, not one task. The stages include roughly 2 days for sourcing fabric, 3 days for pattern making, 3 to 4 days for logo preparation, and 1 to 2 days for sewing. In total, expect around 10 working days from sourcing to a finished sample. A blank sample with no branding can be faster, at about 7 days.

Approval Triggers Bulk Production

Nothing goes into bulk until you are happy with the sample. Production begins once the sample is approved and the bulk deposit is received.

Bulk Production: 5 to 8 Weeks

The bulk window is typically 5 to 8 weeks depending on the style and the trims involved. During the run there are two mid-production inspections, so problems are caught while the line is still moving rather than at the end.

Inspection and Packing: Another Week

Before packing, quality control carries out a final inspection, which takes 3 to 5 days. Packing adds 3 to 4 days, and the shipping paperwork is handled for you. The balance payment falls due before delivery.

Shipping: Choose by Urgency

Air freight is usually 7 to 15 days and express 5 to 7 days, while sea freight runs 28 to 45 days depending on the carrier. If you already work with a forwarder, goods can be delivered to their warehouse instead.

Working Backwards From Your Launch

Add the stages together and a first collection needs roughly two to three months from approved designs to delivered garments, plus your sample revision time. Send your tech pack to Michelle@yimifashion.com for a timeline specific to your styles.
Fashion design illustration sheet: eight sketched outfits with oversized tops, layered straps and denim, presented as flat technical illustrations

Work with us

Ready to make your first production run?

Send your design or tech pack and we will tell you what is possible for your styles, quantities and timeline.

Minimum order

50 pieces per style in one colourway.

Sample

About 10 working days from sourcing to finished sample.

Bulk

5 to 8 weeks after sample approval.